View Issue Details
| ID | Project | Category | View Status | Date Submitted | Last Update |
|---|---|---|---|---|---|
| 0001070 | K18X001.00 SKB SWAN | General | public | 2021-01-06 11:39 | 2021-12-24 20:13 |
| Reporter | Assigned To | (ALTech) SH Son | Due Date | ||
| Priority | high | Severity | s2-severe | Reproducibility | have not tried |
| Status | closed | Resolution | fixed | ||
| Summary | 0001070: Inkel Housing IQC | ||||
| Description | Hi Lonnie, As we reviewed the difference from T0 to T1. Below parts will need the updated drawing for IQC to facilitate the inspection process. Also for all parts from Inkel we need a defined inspection spec for IQC. Plz kindly provide the needed information within this week. 1. 3030-21210-100-0V (CASE TOP Ass'y ) 2. 4320-21155-500-0V (SILICON MIC ) 3. 4320-21154-100-0V (HOLDER MIC ) 4. 911-00001 (CASE BOTTOM ASS'Y ) 5. 913-00001 (GRILL FABRIC ASS'Y ) 6. 4010-21682-100-0V (BRACKET SIDE LED RIGHT ) 7. 4010-21683-100-0V (BRACKET SIDE LED LEFT ) If there are other parts that are modified plz also share with us the list and the drawing. | ||||
| Tags | No tags attached. | ||||
| Attach Tags | |||||
| User List |
(ALTech) SH Son , (ALTech) Sophie Lee , (ALTech) SY Yoon , (HW) Sean Chiang , (PM) Tiffanie Lai , (RD) Jim Chen |
|---|
|
|
Hi Henry Here is T1 2d drawing as you requested. if you need more drawings, please let us know. Thanks SON |
|
|
Hi SH, We also need the sub-parts under each sub-assembly. Plz kindly help provide by 1/18. (Item) PN (GASKET_BUTTON_A) 4050-21738-500-0V (GASKET_BUTTON_B) 4050-21739-500-0V (SCREW) B020-03010-3B1-0SV (CASE BOTTOM) 3030-21211-100-0V (NET FRAME MIDDLE) 3210-21259-100-0V (NET FRAME SIDE RIGHT) 3210-21260-100-0V (NET FRAME SIDE LEFT) 3210-21261-100-0V (FABRIC) 1260-21015-900-0V (BADGE) 5630-21100-800-0V Thanks Henry |
|
|
Hi henry. (GASKET_BUTTON_A) 4050-21738-500-0V (GASKET_BUTTON_B) 4050-21739-500-0V -> I will update to you. but next production (first 1K) will sub assembly form Inkel. (SCREW) B020-03010-3B1-0SV -> please need to MPN (CASE BOTTOM) 3030-21211-100-0V -> I will update to you. below part will "Thermal fusion and bonding" process from the vender. you can not disassemble check each part for detail. Could you please explain why need raw level drawing? // (NET FRAME MIDDLE) 3210-21259-100-0V (NET FRAME SIDE RIGHT) 3210-21260-100-0V (NET FRAME SIDE LEFT) 3210-21261-100-0V (FABRIC) 1260-21015-900-0V (BADGE) 5630-21100-800-0V // Thanks SON |
|
|
Hi SH Sorry I missed the message here. In response to your question: These parts are included in the sub-assembly drawing, IQC will also check the basic info of these parts. For example, the dimension, the coating, etc which differs case by case. Besides, we need some more info for IQC for the next DVT build. 1. Golden samples*2 sets 2. Plz define the critical dimensions. Plz help check when these info will be provided. Thanks, Henry |
|
|
Hi Henry here is 2d drawing as your requested. (GASKET_BUTTON_A) 4050-21738-500-0V (GASKET_BUTTON_B) 4050-21739-500-0V (CASE BOTTOM) 3030-21211-100-0V -------- 1. Golden samples*2 sets 2. Plz define the critical dimensions you means golden sample housing for MP? I will prepare for it. I will send to factory before 1st production. please note that The housing finished color is not confirmed yet. the housing finished colors may be different after initial mass production. So I will provide to you more golden sample if changed the golden sample specification Thanks SON |
|
|
The SWAN already entered the MP stage. There is no further action needed for this issue. So, we close this mantis issue. Thanks! |
| Date Modified | Username | Field | Change |
|---|---|---|---|
| 2021-01-06 11:39 |
|
New Issue | |
| 2021-01-06 11:39 |
|
Status | new => assigned |
| 2021-01-06 11:39 |
|
Assigned To | => (ALTech) Lonnie Kim |
| 2021-01-06 11:39 |
|
Issue Monitored: (RD) Jim Chen | |
| 2021-01-06 11:40 |
|
Issue Monitored: (HW) Sean Chiang | |
| 2021-01-06 11:40 |
|
Issue Monitored: (PM) Tiffanie Lai | |
| 2021-01-06 11:40 |
|
Issue Monitored: (ALTech) SH Son | |
| 2021-01-06 11:40 |
|
Issue Monitored: (ALTech) SY Yoon | |
| 2021-01-06 11:41 |
|
Issue Monitored: (ALTech) Sophie Lee | |
| 2021-01-08 11:02 | (ALTech) SH Son | Assigned To | (ALTech) Lonnie Kim => (ALTech) SH Son |
| 2021-01-08 11:11 | (ALTech) SH Son | File Added: INKEL_2D drawing_20210108.zip | |
| 2021-01-08 11:11 | (ALTech) SH Son | Note Added: 0005757 | |
| 2021-01-08 11:12 | (ALTech) SH Son | Status | assigned => resolved |
| 2021-01-08 11:12 | (ALTech) SH Son | Resolution | open => fixed |
| 2021-01-15 12:13 |
|
Note Added: 0005864 | |
| 2021-01-15 12:13 |
|
Note Edited: 0005864 | |
| 2021-01-15 17:00 | (ALTech) SH Son | Note Added: 0005870 | |
| 2021-01-20 20:01 |
|
Note Added: 0005920 | |
| 2021-01-21 10:40 | (ALTech) SH Son | File Added: INKEL_2D drawing_20210121.zip | |
| 2021-01-21 10:40 | (ALTech) SH Son | Note Added: 0005924 | |
| 2021-12-24 20:13 | (HW) Sean Chiang | Note Added: 0009136 | |
| 2021-12-24 20:13 | (HW) Sean Chiang | Status | resolved => closed |